HomeProductsDuctile Cast Iron ProductsAdjusting Ring690×890×50 Ductile Iron Manhole Cover Adjusting Ring

690×890×50 Ductile Iron Manhole Cover Adjusting Ring

Product Features:

Precision Leveling,Load Distribution,EN124

The 690×890×50 ductile iron adjusting ring is the ultimate redeemer of engineering flaws—within its 50mm micro-adjustment range lies the wisdom to tame earth deformation. Where traditional construction surrenders to elevation errors, its geared track resurfaces with 0.5mm precision; when concrete shafts heave from frost, its liquid level calmly guides realignment. Deeper still: an RFID chip lets maintenance crews read initial data three decades later, while triple seals block not just rainwater but floods of maintenance costs... This is no mere accessory—it’s the revolutionary dawn of full lifecycle management for manhole systems.  

Over two decades of leveling battles, I’ve personally smoothed ten thousand cover bumps with this 690×890 iron ring. Its three-stage adjustment tames erratic asphalt depths, its four-claw anchorage defies roller compactor fury, and its half-century lifespan inscribes an engineering philosophy: "perfection lies in millimeters." As you drive over mirror-smooth roads, you may never notice the ring beneath—yet it’s this 50mm of precision that transforms roaring wheels into urban rhythm, filling every journey home with tranquility.

Product Description

I.Core Function: The Precision Micro-Adjustment Hub of Manhole Systems  

1.3D Leveling Revolution  

  • 50mm adjustable height: Combines sidewall geared tracks (0.5mm precision) with adjustment bolts for ±25mm stepless elevation correction, eradicating protrusions/sags from shaft construction errors.  
  • Auto-level compensation: Liquid suspension level provides real-time tilt feedback during bolt rotation, ensuring ≤0.3° cover-road angle.  

2.Load Transfer Optimization  

Tapered diffusion design: 690×890mm top for cover seating expands to 750×950mm base, dispersing pressure to shaft walls. Reduces shaft stress by 30%, suppressing settlement at its root.  

II.Five Battlefield Advantages: Guardian of Road Smoothness  

1.Eliminate "Cover Bounce"  

  • Three-tier adjustment matches asphalt paving depths, keeping covers 0–5mm below road surface—zero vehicle impact.  
  • Highway toll tests show 12dB noise reduction post-installation.  

2.End "Peri-Cover Edge Rot"  

  • Rubber seal groove + reverse-slope ring design blocks 99% rainwater from seeping into subgrade.  
  • Five-year use in rainy cities reduces road cracking around covers by 90%.  

3.Settlement-Proof Skeleton  

  • 50mm ductile iron base + radial ribs withstands >40-ton loads, engineered to resist roller impact.  
  • Bolt-hardened to shaft eliminates ring sinking from traditional mortar fixation.  

4.30-Second Lightning Installation  

  • Pre-assembled ring/cover hoisted as one unit; leveled during concrete pour. Single worker completes in 30 seconds (vs. 30 minutes traditionally).  
  • Four-way anchor claws with leveler slots limit installation error to ≤1°.  

5.-30°C Ice-Fire Warrior  

  • Ductile iron resists freeze-thaw cycles—survives three -30°C disassemblies without cracking.  
  • Thermal-sprayed zinc coating endures 150°C asphalt paving heat, lasting 30 years.  

III.Construction Mastery: The Millimeter Artistry of Veterans  

1.Precision Embedding Quad-Step  

  • Dig: Excavate 10cm wider than ring’s outer edge.  
  • Hoist: Lower pre-assembled ring/cover unit.  
  • Adjust: Rotate ring to select tier; laser-level calibrate.  
  • Lock: Diagonal-tighten bolts at ≥120N·m torque.  

2.Waterproofing Golden Rule  

  • Seal joints: 45°-angled adhesive bonding for rubber gaskets eliminates leakage.  
  • Fill ring-shaft gaps with non-shrink grout (hardness > C40 concrete post-cure).  

3.Asphalt Fusion Secrets  

  • Apply bitumen bonding agent to ring surface pre-paving.  
  • Manually clear overflow around ring during 140°C initial compaction—ensures seamless integration.

IV.Irreplaceable Battlefields  

  • 1. Road Overhauls: Bridges new/old asphalt layer gaps, eliminating shaft reconstruction.  
  • 2. Soft Soil Sections: Hard-connection resists differential settlement, curing "wavy roads".  
  • 3. Highway Toll Plazas: Precision leveling protects weighing equipment from vibration.  
  • 4. Smart Cover Upgrades: Pre-embedded sensor conduits enable IoT retrofits.  
  • 5. Arctic Zones: Matches asphalt’s thermal expansion coefficient—maintains seal at -30°C.  

Vs. Concrete Adjusting Rings: Ductile iron rings deliver 3× higher load capacity, 60× faster leveling, and 200% longer lifespan—an essential necessity for modern efficient construction!

Luzhongbao

High Precision from Luzhongbao!

Provide your needs

Request a Quote

If you have any questions
please feel free to contact us.

Learn more about Luzhongbao

Focus on the field of caterpillar mobile crushing and screening, so that solid waste recycling more efficient!

Equipped with modern production equipment and optimized production processes, we can deliver products quickly and with high quality to meet customers' time requirements.
Free to contact us